S/No

Project

 

Abia State

1         

Design and construction supervision of Ariaria Water Supply Scheme, Aba, Abia State involving:

-      Water distribution network of 5km length, 6-bar UpVC pipe of sizes 300mm, 250mm, 150mm and 100mm dia.

-      Rehabilitation treatment plant of 400m3/d capacity,

-      Environmental Social Impact Assessment (ESIA) and implementation of Environmental Social Management Plan

(December 2020 – March 2022)

 

2         

Design of Ubakala Water Supply Scheme, Umuahia, Abia State involving:

-      Water distribution network project of 5km length, 6-bar UpVC pipe of sizes 300mm, 250mm, 150mm and 100mm dia.

-      Rehabilitation treatment plant project of 400m3/d capacity,

-      Environmental Social Impact Assessment (ESIA)

(December 2020 – March 2021)

 

 

 

 

3         

Design of CKC Water Supply Scheme, Aba, Abia State involving:

-      Water distribution network of 10km length, 6-bar UpVC pipe of sizes 300mm, 250mm, 150mm and 100mm dia.

-      Rehabilitation treatment plant of 800m3/d capacity,

-      Environmental Social Impact Assessment (ESIA)

(December 2020 – March 2021)

 

 

Delta State

4         

Design and construction supervision of Iseluku water supply schemes, Iselle-Ukwu, Delta State involving:

 

-        Water distribution network of 8km length of 110mm dia, 6km of 160mm dia and 4km of 200mm dia UpVC pipe network,

-        Rehabilitation of treatment plant of 740m3/day capacity,

-        Rehabilitation of 150m3 EWT,

-        Rehabilitation of 750Kva power transformer substation on dedicated 11KVA national grid

-        Environmental Social Impact Assessment (ESIA) and implementation of Environmental Social Management Plan

 

(July 2021 – December 2021)

 

5         

Design of Ogwashi-Uku water supply schemes, Ogwashu-Uku, Delta State involving:

-       rehabilitation of treatment plant of 450m3/day capacity,

-       laying of 8km length of 110mm, 6km of 160mm and 4km of 200mm dia. UpVC pipe network,

-       District Metering Areas (DMA) including Bulk meters for DMAs,

-        Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances

-       installation of water supply network including pipelines, valves, and pressure gauges, transmission system from sources to reservoirs,

-       rehabilitation of 11kVA power transformer substation on dedicated 11KVA national   grid

-       Environmental Social Impact Assessment (ESIA)

(December 2020 – March 2021)

6         

Design of Okpanam water supply scheme, Okpanam, Asaba, Delta State involving:

-       Water distribution network project of 8km length of sizes, Ø110mm and Ø160mm UpVC pipe network,

-       New treatment plant of 350m3/day capacity,

-       Okpanam District Metering Area (DMA) and Bulk meters in the DMA,

-        Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances

-       Water supply network system including pipelines, valves, and pressure gauges, transmission system from sources to reservoirs,

-       Power supply system of 450kVA/11kV power transformer substation on dedicated national grid mains

-       Environmental Social Impact Assessment (ESIA)

 

(December 2020 – March 2021)

 

7         

Design for the refurbishment of water supply system and treatment chambers project at Ozoro, Obiaruku, Koko, Sapele, Umunede in Delta State involving:

-        Water supply / distribution network project of 2km length in 75mm dia UpVC pipe,

-        Rehabilitation of the treatment chambers,

-        Stand-pipe with 4-fetch-plinth and 200m long wastewater drains

-        Environmental Social Impact Assessment (ESIA)

 

(December 2020 – March 2021)

 

 

 

 

 

 

 

 

 

 

 

Imo State

8         

Design and construction supervision of distribution network project of 3.85km long, 300mm dia. UpVC pipe from Munchie Junction to IMSU Campus in Owerri City involving:

 

-        Water distribution network of 2.65km length of 110mm and 160mm dia UpVC pipelines including appurtenances,

-        Water supply transmission mains of 1.2km length 200mm dia UpVC pipeline,

-        Rehabilitation of pipe connections with 50m3 EWT,

-        Environmental Social Impact Assessment (ESIA) and implementation of Environmental Social Management Plan

 

((December 2020 – March 2022))

 

9         

Design of Egbeada water supply and distribution network project, Egbeada, Owerri, Imo State involving:

-      Water supply main in coated steel pipes of 100m long, 300mm (100m in length), diameter 250mm (500m in length) and diameter 200mm (200m in length),

 

-      Disconnection from existing to the new transmission mains from Egbeada booster station Pump tto the Elevated Water Tank.

 

-      Environmental Social Impact Assessment (ESIA)

 

(December 2020 – March 2021)

10      

Design of water supply and distribution network project in high pressure of 16 bars, PE pipe of 6km length of pipeline for maintenance and the replacement of the damaged and Asbestos pipes in Owerri City, Imo State

 

11      

Design of Aladinma Estate Model District Metered Area (DMA) project, Aladinma, Owerri, Imo State involving:

-       Water supply and distribution network systems including pipelines, valves, and pressure gauges, transmission system from reservoirs to DMA,

-       District Metering Areas (DMA) including Bulk meters for DMAs,

-        Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances

-      Environmental Social Impact Assessment (ESIA)

 

(December 2020 – March 2021)

 

 

Niger State

12      

Design and construction supervision of 2.2km length Transmission Mains improvement project in Minna, Niger State involving:

-      Disconnection of 2200 consumers’ connection on the transmission / rising main,

-      Distribution pipeline of 2.2km alongside the rising main for the reconnection of 2200 consumers,

-      Installation of post-treatment improvement units consisting of Alum, Lime and HTH (chlorination)

-        Environmental Social Impact Assessment (ESIA) and implementation of Environmental Social Management Plan

(December 2020 – March 2022)

13      

Design and construction supervision of Minna Pilot District Metered Area (DMA) project, Minna, Niger State involving:

 

-       Distribution network of 16km length of 110mm, 6km of 160mm and 4km of 200mm dia. UpVC pipe network,

-       District Metering Areas (DMA) including Bulk meters for DMAs,

-        Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances

-       installation of water supply network including pipelines, valves, and pressure gauges, transmission system from sources to reservoirs,

 

-       Environmental Social Management Plan (ESMP)

 

(July 2021 – December 2021)

14      

Design of Service Reservoirs project of 500m3 and 100m3 capacity of 16m high Steel / GRP structure at Pogo Village and Paiko Junction respectively to provide access to the 2 major communities along the Pumping Main on Minna - Suleja Road involving:

 

-        Site survey map of reservoir site,

-        General layout design/drawing,

-        Hydraulic analysis layout including geotechnical details,

-        Design details and drawings for foundation, pipelines, piping connections, drainage structures,

-        Structural details and drawings for stanchions, base and top plates, sidewalls, access ladders, ventilators, lightening arrestors, etc.,

-        Detailed drawing for pumps, pump-house, power supply and connections,

-        Miscellaneous and ancillaries; perimeter fence with entrance gates, potable water supply, chambers, ducts, perimeter lighting,

-        Environmental Social Impact Assessment (ESIA)

 

(December 2020 – March 2021)

 

15      

Design of 2.2km length Transmission Mains improvement project in Minna, Niger State involving:

-      Disconnection of 2200 consumers’ connection on the transmission / rising main,

-      Distribution pipeline of 2.2km alongside the rising main for the reconnection of 2200 consumers,

-      Installation of post-treatment improvement units consisting of Alum, Lime and HTH (chlorination)

-      Environmental Social Impact Assessment (ESIA)

(December 2020 – March 2021)

 

 

16      

Design of Minna Pilot District Metered Area (DMA) project, Minna, Niger State involving:

 

 

-       Distribution network of 16km length of 110mm, 6km of 160mm and 4km of 200mm dia. UpVC pipe network,

-       Installation of bulk meters for DMAs,

-       District Metering Areas (DMA) including Bulk meters for DMAs,

-        Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances

-       installation of water supply network including pipelines, valves, and pressure gauges, transmission system from sources to reservoirs,

-       Environmental Social Impact Assessment (ESIA)

 

(December 2020 – March 2021)

 

 

Taraba State

17      

Design and construction supervision of water distribution network project of 16km length in Central Supply area of Jalingo, Taraba State involving:

 

-        Water distribution network of 16km length of sizes 300mm, 200mm, 160mm, and 110mm dia. Pipelines including appurtenances,

-        Rehabilitation of pipe connections with existing 3500m3 EWT,

-        Environmental Social Impact Assessment (ESIA) and implementation of Environmental Social Management Plan

 

(December 2020 – March 2022)

 

18      

Design of water distribution network project of 55km total length for Five towns (Jalingo, Wukari, Gembu, Zing and Jen) in Taraba State involving:

-       Distribution network of 75mm, 110mm and 160mm dia UpVC pipe network,

-       Supply / transmission mains from reservoir to network areas including necessary control valves,

-       Pipeline protection, FH, drainage, indicator posts, etc

-       Environmental Social Impact Assessment (ESIA).

 

(December 2020 – March 2021)

 

19      

Design of 3,500m3 storage reservoir capacity project of 16m high Steel / GRP structure in Jalingo, Taraba State involving:

 

-        Site survey map of reservoir site,

-        General layout design/drawing,

-        Hydraulic analysis layout including geotechnical details,

-        Design details and drawings for foundation, pipelines, piping connections, drainage structures,

-        Structural details and drawings for stanchions, base and top plates, sidewalls, access ladders, ventilators, lightening arrestors, etc.,

-        Detailed drawing for pumps, pump-house, power supply and connections,

-        Miscellaneous and ancillaries; perimeter fence with entrance gates, potable water supply, chambers, ducts, perimeter lighting,

-        Environmental Social Impact Assessment (ESIA)

 

(December 2020 – March 2021)

 

20      

Design of Jalingo Pilot District Metered Area (DMA) project, Jalingo, Taraba State involving:

 

-       Distribution network of 16km length of 110mm, 6km of 160mm and 4km of 200mm dia. UpVC pipe network,

-       District Metering Areas (DMA) including Bulk meters for DMAs,

-        Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances

-       installation of water supply network including pipelines, valves, and pressure gauges, transmission system from sources to reservoirs,

-       Environmental Social Impact Assessment (ESIA)

 

(December 2020 – March 2021)

 

21      

Design of Water Supply Scheme for Federal University of Technology, Akure, Nigeria involving:

 

-      Raw water intake: 4.25mil cu.m

-      Treatment Plant: - 3,200cu.m/day

-      Reservoirs: 1,500 cu.m,

-      Transmission Main and distribution Network: 5.0km

-      Environmental Social Impact Assessment (ESIA)

(December 2019 – March 2020)

 

22      

Consultancy Services for the supervision of Rehabilitation and Expansion of Igbesa Water Supply Scheme involving storage reservoirs, transmission pipelines and distribution network, Igbesa, Ogun State.

 

(June 2021 – June 2021)

 

23      

Design and Supervision of Construction works of the Upgrading and Expansion of Water Distribution Network in selected towns in Damboa Local Government Area, Damboa, Borno State

 

(April 2018 – May 2020)

 

24      

Consultancy Services for Safety Enhancement Plan project for Ero, Egbe, Ureje and Itapaji Dams;

•    Ero Dam capacity 104,500m3/day. Spillway; 33m, structure 40,000m3. Egbe Dam spillway 500m, maximum dam height of 25m

•    Ureje Dam earth dam 900m, capacity 10,000m3/day 

•    Itapaji Dam earth dam with concrete 400m height 24m. capacity 5, 175m3/day, spillway; 120m

(November 2016 – January 2017)

 

25      

Consultancy Services for the Design Review and Construction Supervision of Water Distribution Network to Areas under Arakanga Water Supply Scheme, Iberekodo, Abeokuta, Ogun State

 

(February 2019 – March 2020)

 

26      

Construction Supervision of Rehabilitation of Oyo Regional Water Supply Scheme, Oyo Town in Oyo State

−     22,000m3/day Raw water supply system 350mm diameter steel raw water mains,

−     Treatment Units 9,000m3/day capacity

−     4,800m3 capacity service reservoir

−     Ancillary works.

 

(February 2011 – Dec 2019)

 

27       

Detailed study and design of private water supply services for six (6) towns (Iganna, Shaki, Ogbomosho, Ootu, Igangan and Oyo) in Oyo State based on total population (2.353mil), land area (59,015ha), average per capita-demand (200lcd), estimate of viable customers (pprox.. 300,000pers) among other factors.

 

(Jan 2016)

 

28       

Detailed hydraulic analysis and design of Water Distribution and Wastewater Networks project for Ilubirin, Victoria Island, Lagos covering 64.8ha and involving water supply network (2.4km length of 100 – 150mm diameter pipes, 25 nodes, pressure range of 3.4 to 4.5 bars) wastewater network (5.9km length of 100 – 150mm diameter pipes, 45 nodes)

 

(June – September 2016)

 

29       

Consultancy Services for the executions of Project, for the Provision of Potable Water through Desalination by Reverse Osmosis Process for Riverine Communities in Ondo State.

 

July 2010 – October 2015

 

30       

Study and design of Gravity Irrigation Scheme (Irrigation and Dam Component) at Farm Centre (II), Abeokuta. Irrigation Network; - 11.27km main canal; 6.15km tertiary canal.

 

(October 2015 – January 2015)

 

31       

Design and schedule of materials for the Water Distribution Network project in VGC Estate, Lagos covering 2.6km2, 34.9km length of 100 - 150mm diameter pipes, 1050 nodes, pressure range of 3.4 to 4.5 bars with booster pumps for multi-storey buildings

(June – September 2014).

 

32       

Design of Water Distribution Network project covering Melrose Estate; 5,061m length of HdPE 100, 75 and 110 mm diameter sizes, 612 Nodes, 2.5 – 4.0 bars, and Ikeja Estate; 340m length of PE 100, 75 and 110 mm diameter sizes, 24 Nodes, 3.0 – 4.5 bars

 

(June – September 2014).

 

33       

Design and construction supervision of Flood and Erosion control facilities for the Four (4) Priority Sites within Ibadan metropolitan in Oyo State.

Locations;

·      Saasa- Osajin Apete Road, 2 x 3m Double-cell Box Culvert

·      Ola Adua- Old Akufo Road, 2 x 3m Triple-cell Box Culvert

·      Cele Rainbow- Ojo Ekun, 2 x 3m Triple-cell Box Culvert and

·      Ogbere Pegba- Egbeda Tuba Road 2 x 15m span Bridge

 

(January 2014 – April 2016)

 

34       

Detailed engineering design of Flood and Erosion control of Two (2) Priority Sites within Ibadan metropolitan in Oyo State. (Design Stage) involving:

 

·      15m Single Span Bridge at Abonde Area and

·      20m Single Span Bridge at Abatakan Area and Associated Structures

 

July 2016 – October 2016.

35       

Design of Water Supply Scheme at Obafemi Awolowo University Teaching Hospital Complex, Ile Ife consisting of (i) Dam lake: 4.25mil m3, (ii) Treatment Plant: - 1,500m3/day, (iii) Reservoirs: 2 x 3,000m3, and (iv) Transmission Line: 5.0km

(August 2010 – September 2013)

36      

Consultancy services for design of Nasarawa Irrigation Project consisting of

(i)       Laminga in Karu / Nasarawa LGA; 6,600ha,

(ii)      Doma in Doma LGA; 6,600ha,

(iii)     Garaku in Kokona / Nasarawa / Doma LGAs; 3,100ha,

 

(iv)     Ushim in Nasarawa LGA; 4,500ha. Total irrigation field; 20,800ha.

November 2017 – February 2019

37      

Consultancy services for Hydrographic Survey project Of Oyan River Dam Reservoir and Design of Rehabilitation Works, Abeokuta

Flood flow of storm water over the 2,129.17km2, minimum flow 22m3/s, normal flow; range of 380 to 3,800m3/s, peak (flood discharge) flow is 5,280m3/s.

(October 2012 – November 2013)

1.1.1       Flood and Erosion Control Projects

S/No

Project

1       

Consultancy services for the Construction Supervision of Flood and Erosion Control Project in Ika and Oruk Anam LGA, Akwa Ibom North West Senatoria District of Akwa Ibom State

December 2016 – November 2017

2       

Consultant for the Supervision of Water related Projects;

Erosion Control Project at Ujiri Mkt Square – Mbogu – Ndibe Ekwelle Achi Oji River LGA, Enugu State.

November 2016 – October 2017

3       

Consultancy services for the Construction Supervision of Flood and Erosion control of Four (4) Priority Sites within Ibadan metropolitan in Oyo State. (Design Stage) at:

·  Saasa- Osajin Apete Road, 2 x 3m Double-cell Box Culvert

·  Ola Adua- Old Akufo Road, 2 x 3m Triple-cell Box Culvert

·  Cele Rainbow- Ojo Ekun, 2 x 3m Triple-cell Box Culvert and

·  Ogbere Pegba- Egbeda Tuba Road 2 x 15m span Bridge

August 2016 – July 2017

4       

Consultancy services for the detailed engineering design of Flood and Erosion control of Two (2) Priority Sites within Ibadan metropolitan in Oyo State. (Design Stage). Details;

·      15m Single Span Bridge at Abonde Area and

·      20m Single Span Bridge at Abatakan Area and Associated Structures

. July 2016 – October 2016

5       

Consultancy services for the detailed engineering design and construction supervision of Palliative Work on Alaro Culvert, Ibadan.

January 2015 – August 2015

6       

Consultancy services for the detailed Engineering Design of Flood and Erosion control of Four (4) Priority Sites within Ibadan metropolitan in Oyo State. (Design Stage)

Locations;

·  Saasa- Osajin Apete Road, 2 x 3m Double-cell Box Culvert

·  Ola Adua- Old Akufo Road, 2 x 3m Triple-cell Box Culvert

·  Cele Rainbow- Ojo Ekun, 2 x 3m Triple-cell Box Culvert and

·  Ogbere Pegba- Egbeda Tuba Road 2 x 15m span Bridge

January 2014 – April 2014

 

 

S/No

Project

7       

Engineering Study and design of Construction of Alvan Ikoku College of Education Internal Road Drainage Network at New Land across the River Nworie, Owerri

a)   Construction of reinforced concrete crib – retaining wall, land reclaimation.

b)   Construction of lined drains and culverts along the road network within the new extension area of the campus, at the other side of Nworie River

c)    Construction of access Bridge (2 x 15m long span) across the Nworie River

October 2011 – January 2012

8         

Ektiti State Water and Flood Control Project: Design of Gully Erosion Control at Odo Ado and Ijero Ekiti

-          Concrete Channel  - 3.0 x 5m; 2.4km long

-          Concrete Line drains (1.2 x 1.2m; 1.6km long

-          Pedestrian bridges; 4No.

-          Vehicle bridges – 1No.; 1 x 8m long

-          Access box culverts (3 x3 –single cell) 4Nos

-          Inlet storm water channel and discharge

(Sept 2007 – April 2008)

9         

Ektiti State Water and Flood Control Project:

Design of Gully Erosion Control at Igogo

-      Concrete Channel - 3.0 x 6.5m; 3.82km long

-      Concrete Line drains (1.0 x 1.5m; 2.4km long

-      Pedestrian bridges; 6Nos.

-      Access box culverts (3 x3 –single cell); 6Nos

-      Inlet storm water channel and discharge

-      Retaining wall; total length = 285m

Sept 2007 – December 2007

Flood Control, Roads, Huighway, Jetties, Dams and Irrigation Projects

S/No

Project

1         

Consultancy services for design of Nasarawa Irrigation Project consisting of

(i)               Laminga in Karu / Nasarawa LGA; 6,600ha,

(ii)              Doma in Doma LGA; 6,600ha,

(iii)            Garaku in Kokona / Nasarawa / Doma LGAs; 3,100ha,

(iv)            Ushim in Nasarawa LGA; 4,500ha. Total irrigation field; 20,800ha.

2         

Consultancy Services for Safety Enhancement Plan for Ero, Egbe, Ureje and Itapaji Dams

Ero Dam capacity 104,500m3/day. spillway; 33m, structure 40,000m3.

Egbe Dam spillway 500m,maximum dam height of 2Sm

Ureje Dam earth dam 900m, capacity 10,000m3/day

Itapaji Dam earth dam with concrete 400m height 24m. capacity 5, 175m3/day, spillway; 120m

(November 2016 – January 2017)

3         

Study and design of Gravity Irrigation Scheme (Irrigation and Dam Component) at Farm Centre (II), Abeokuta. Irrigation Network; - 11.27km main canal; 6.15km tertiary canal

(October 2015 – January 2015)

4         

Study and design of Irrigation Scheme (Irrigation and Dam Component) at Igbojaye in Oyo State

Irrigation Network; - 5.82km main canal

-                  2.44km tertiary canal

(October 2014 – December 2014)

5         

Consultancy services for Hydrographic Survey Of Oyan River Dam Reservoir and Design of Rehabilitation Works, Abeokuta

Flood flow of storm water over the 2,129.17km2, minimum flow 22m3/s, normal flow; range of 380 to 3,800m3/s, peak (flood discharge) flow is 5,280m3/s.

(October - November 2012)

6         

Construction Supervision of Rehabilitation of Oyo Regional Water Supply Scheme, Oyo Town in Oyo State

−     22,000m3/day Raw water supply system 350mm diameter steel raw water mains,

−     Treatment Units 9,000m3/day capacity

−     4,800m3 capacity service reservoir

−     Ancillary works.

(February 2011 – May 2012)

 

 

7         

Design of Water Supply Scheme at Obafemi Awolowo University Teaching Hospital Complex, Ile Ife

Dam lake: 4.25mil cu.m

Treatment Plant: - 15,000cu.m/day

Reservoirs: 2 x 3,000 cu.,

Transmission Line: 5.0km

(August 2010 – September 2010)

8         

Consultancy Services for the executions of Project for the Provision of Potable Water through Desalination by Reverse Osmosis Process for Riverine Communities in Ondo State.

July 2010

9         

Detailed design and procurement of Refurbishment of the existing Low and High Lift Pump Stations at Asejire Water Supply Scheme.

-      Repair and installation of new LLPS 6 x 45,000cu.m

-      Repair and installation of new HLPS 4 x 25,000cu.m/hr, 3 x 30,000cu.m/hr

(March 2010 – August 2010)

10      

Design for the Rehabilitation of Ede Headwork, Ede in Osun State

-       Replacement of low lift pumps – 4 x 25,000cu.m/hr.

-       High Lift Pumps; 6nos for total output of 180,000cu.m/day

-       Treatment Unit, chemical plant, chlorination, storage reservoir (45,000) and 2MVA Generator set

(March 2010 – September 2010)

11      

Design for the Rehabilitation of Igboho Water work, Igboho in Osun State

Dam lake: 1.2mil cu.m

Treatment Plant: - 22,700cu.m/day

Reservoirs: 2 x 3,000 cu.,

Transmission Line: 5.0km

(March 2010 – September 2010)

12      

Consultancy services for the design and supervision of the relocation of water supply pipelines and facilities affected by Queen Cinema – Dugbe – Oke Bola – Molete road dualisation project. (9.5km BHS)

(Oct 2009 – Sept 2010)

13      

Study and design of Irrigation Scheme (Irrigation and Dam Component) at Onipaanu in Oyo State

Dam lake: 2.72mil cu.m/175 Ha

Irrigation Network; - 4.38km main canal

-             7.22km tertiary canal

(December 2008 – April 2009)

14      

Study and Design of Medium Earth dam at University of Ibadan, Ibadan.

Dam lake: 1.38mil cu.m/124 Ha

Treatment Plant: - 13,800cu.m/day

Reservoirs: 2 x 6,500 cu.,

Transmission Line: 5.0km

Distribution Network; 15.4km

(June 2008 – Nov 2008)

 

 

15      

Study and Design of Small/Medium Earth dam at Ikorodu.

Dam lake: 9.62mil cu.m/275 Ha.

(March 2008 – Sept 2008)

16

Feasibility Studies for Ibadan Water Supply Project III

·     Expansion and extension of the existing water distribution network in Ibadan city from the present 109,600m3/day to 361,400m3/day,

·     Improvement of existing water distribution network & repair work on the headwork

(Nov 2007 – Apr 2008)

17

Consultancy services for road and transportation projects in Ondo State involving

(i)           Design of concrete Jetty (6.0m x 30.0m on piled foundation) and 1.0 piled-deck walkway in Obenla, Ilaje LGA; April 2022 – June 2022

(ii)          Design and construction supervision of Ugbonla - Aiyetoro road (6.54km); October 2021 – February 2022

(iii)        Design and construction supervision of rehabilitation of Alape Bridge to Araromi Waterside (32.7km), Ondo State; March 2021 – December 2022

(iv)        Design and construction supervision of Coastal road, Araromi Seaside, Ondo State – Ode omi, Ogun State - Ibeju - Lekki - Lagos with spurs (37.5km); November 2018 – December 2023

(v)          Review of design and construction supervision of Aboto-Atijere road (28.5km); December 2019 – October 2022

(vi)        Design and construction supervision of Kiribo, Igbotu, Igbobini communities in Ondo State (5.4km); October 2018 – December 2020

(vii)       Design and construction supervision of Flyover / Interchange Bridge at Ondo-Okitipupa Road and Sagamu - Ore - Benin Expressway Junction, Ore, Ondo State; May 2018 – June 2020

(viii)      Design and construction supervision of single carriageway from Ijoka/Okeya Junction - Okeobere Elemo – Idanre Township with spur to Okeya & Igisogba   Ondo State (15.0km); July 2017 – October 2021

(ix)         Design and construction supervision for Dualisation of Oba Adesida road (A-Division)- Hospital (Oba-Osupa) road-Oluwatuyi road – Ijoka (Oke Iya junction) with spur to Alafia Tayo (roundabout) and Idiagba Tuntun (Investment Junction) (8.13km); July 2017 – December 2022

(x)          Design and construction supervision of Sabomi - Ajagba (East-West Access) road (2.0km); April 2017 – August 2018

(xi)         Design of rehabilitation of Ore Township Road Project (Section II: Sabo to Lagos/Benin expressway - 2.5km); April – November 2017,

(xii)       Design and construction supervision of the rehabilitation of Ore Township Road Project (Section 1: Mobil to Sabo Junction - 0.5km); April 2017 – June 2022

 

 

 

S/No

Project

18

Extention of Services of Civil Engineering Consultant for the Supervision of Construction of On-going Dualisation Road and Bridge Projects in Oyo State

i.     Dualisation of Idi Ape – Bashorun – Odogbo Road Project, Ibadan.

ii.    Dualisation of Oke Adu – Agodi Gate – Airport Road Project, Ibadan.

iii.   Dualisation of Saki – Ilesa – Ibariba Road Project

iv.   Ibadan – Ologuneru – Eruwa Road Project

May 2013 – June 2014

19

Engineering Consultant for the Supervision of Construction of On-going Dualisation Road and Bridge Projects in Oyo State

v.    Dualisation of Idi Ape – Bashorun – Odogbo Road Project, Ibadan.

vi.   Dualisation of Oke Adu – Agodi Gate – Airport Road Project, Ibadan.

vii. Dualisation of Saki – Ilesa – Ibariba Road Project

viii.          Ibadan – Ologuneru – Eruwa Road Project

May 2016 – April 2017

20

Supervision of Construction of Road and Bridge Projects in Oyo State

Dualisation of Ilorin Expressway Junction – Takie – Palace – Ogbomoso Grammar School Road Project, Ogbomoso.

May 2013 – June 2014

21

Construction of Jetty at Port Harcourt, Rivers State involving Quay Structures, Berthing Jetty, Boats Shed, Waiting room, Utilities, Access road, Bid documents, etc.

April 2013 – December 2014

22

Construction Supervision of Ibafo – Mowe – Ofada Road Project, Ogun State (55km) and 2Nos; 15 x 20m long span bridge.

March 2013 – March 2014

23

Consultancy series for the Special Road Projects of Governments in the State of Osun: Osun West Senatorial District

May 2012 – May 2013

24

Construction Supervision of dualisation of Sango – Ojodu Abiodun Road, Sango (60km) and 2Nos; 15 span x 20m long span bridges

January 2013 – June 2014

25      

Consultancy services for the construction of Access Road and Car Park to 2500 Capacity Auditorium Complex.

May – Sept 2012

26      

Design and Construction Supervision Rehabilitation of Ede – Logun – Araromi – Ojudo – Ode Omu Road Project – Design Stage

August 2009 – November 2009

 

 

S/No

Project

27      

Project management services on Road/Civil Engineering projects.

January 2009 – December. 2009

28      

Consultancy services for the construction of Oye – Are road project (12.15km).

January 2009 – December 2009

29      

Design of Slab Deck Bridge (3 x 9m at Ch 5+116, and 1 x 8m at Ch 10+378 & Ch 14+200 long span) Gungji – Shiwer – Dokpai with Spur to Tiplik Road (33Km).

Dec 2008 – January 2009

30      

Construction of River Ero Bridge at Ewu (2 x 15m long span).

December 2008 – June 2009

31      

Design of Bridge (2 x 12m long span) over Ogun River at Km. 22+950 along Sepeteri – Igboho Road.

September – December 2008

32      

Rehabilitation of Ife Township Road, Ile Ife.

July 2008 – July 2009

33      

Design of bridge (4 x 12m long span) at Km 1+800 along Sepeteri – Igboho Road.

May 2008 – June 2008

34      

Consultancy services for the Rehabilitation of Access Road within the Polytechnic, Iree.

Feb 2008 – August 2008

35      

Construction of Iware – Akinmorin Road Project. (12.8km, including 1 x 8.3m long single span Bridge.)

February – June 2008

36      

Construction of Iresa Adu – Ilajue Road Project (26.75km, including 1 x 13m long single span Bridge.)

March – July 2008

37      

Consultancy Services for the Design of Dualization of Molete Dugbe – Queen Cinema Road Project involving the extension of 2 x 15m double span Bridge at Dugbe Alawo, Ibadan

Nov. 2007 – January 2008

38      

Consultancy services for the Honeycomb Road Development Scheme

Apr 2007 – August 2008

S/No

Project

1         

Tertiary Education Trust Fund (TETFUND) Normal Intervention for the Polytechnic, Ibadan.

Construction of Science Laboratory at Eruwa Campus, The Polytechnic, Ibadan.

Sept 2013 – June 2014

2         

Construction Supervision of Osogbo Zonal Stadium Project VIP Pavilion, Popular stands, Offices, Lockup Shops, Utility Complex, Main Bowl, Badminton, Hockey, Swimming Pool, Table and Lawn Tennis Courts and Stands, Landscaping, Waste and Water sewage Channel structures.

Sept 2010 – August 2015

3         

Monitoring Consultancy Supervision of On-going Building Projects of Osun State University (Osogbo, Ejigbo Campuses) involving

§   Site preparation & Sub-structure

§   Frame, Walls, Roof, Doors & Windows

§   Electrical & Mechanical Installations

§   Finishes & Paints

§   Road/Parking pavement

§   Borehole/Water Booster s-m

§   External Water Supply Pipes

§   External Electrical Distribution

§   Generating Set (Group A)

June 2010 – May 2013

4

Upgrade of State Hospital Asubiaro to Teaching Hospital – Component II

-        Gate/ Generator house

-        Library Complex

-        OPD/Ward/Surgical Complex

-        Medicine / Offices Complex

  • Evidence of availability of Pavement Evaluation Equipment, and Laboratory including the equipment required for the relevant Tests.

    HDM IV
         

         

    Pavement Evaluation
    CBR
    HDM IV
    List of the relevant Tests to be carried out on the Pavement and Road Materials.

    Pavement and Road Materials
    Soil filling materials
    Pavement; sub base and base course materials
    Crushed Stone Products for base course and concrete
    The list of relevant test to be carried out on the Pavement and Road Material in the course of design of the rehabilitation work and Asphalt overlay are enumerated as follows;

Abfort Associates as an engineering consulting firm is registered member by the Council of Registered Engineers of Nigeria (COREN). It has well-seasoned and experienced engineers, who are members of the Nigeria Society of Engineers (NSE), and registered by the Council for the Regulation of Engineering in Nigeria, in relevant disciplines.

Connect

Comfort Adebisi Multi-Purpose Complex
KM 8 Al-Hayyu Junction

+234 803 706 5878

 

 

,