1.1.1 Flood and Erosion Control Projects
S/No |
Project |
1 |
Consultancy services for the Construction Supervision of Flood and Erosion Control Project in Ika and Oruk Anam LGA, Akwa Ibom North West Senatoria District of Akwa Ibom State December 2016 – November 2017 |
2 |
Consultant for the Supervision of Water related Projects; Erosion Control Project at Ujiri Mkt Square – Mbogu – Ndibe Ekwelle Achi Oji River LGA, Enugu State. November 2016 – October 2017 |
3 |
Consultancy services for the Construction Supervision of Flood and Erosion control of Four (4) Priority Sites within Ibadan metropolitan in Oyo State. (Design Stage) at: · Saasa- Osajin Apete Road, 2 x 3m Double-cell Box Culvert · Ola Adua- Old Akufo Road, 2 x 3m Triple-cell Box Culvert · Cele Rainbow- Ojo Ekun, 2 x 3m Triple-cell Box Culvert and · Ogbere Pegba- Egbeda Tuba Road 2 x 15m span Bridge August 2016 – July 2017 |
4 |
Consultancy services for the detailed engineering design of Flood and Erosion control of Two (2) Priority Sites within Ibadan metropolitan in Oyo State. (Design Stage). Details; · 15m Single Span Bridge at Abonde Area and · 20m Single Span Bridge at Abatakan Area and Associated Structures . July 2016 – October 2016 |
5 |
Consultancy services for the detailed engineering design and construction supervision of Palliative Work on Alaro Culvert, Ibadan. January 2015 – August 2015 |
6 |
Consultancy services for the detailed Engineering Design of Flood and Erosion control of Four (4) Priority Sites within Ibadan metropolitan in Oyo State. (Design Stage) Locations; · Saasa- Osajin Apete Road, 2 x 3m Double-cell Box Culvert · Ola Adua- Old Akufo Road, 2 x 3m Triple-cell Box Culvert · Cele Rainbow- Ojo Ekun, 2 x 3m Triple-cell Box Culvert and · Ogbere Pegba- Egbeda Tuba Road 2 x 15m span Bridge January 2014 – April 2014 |
S/No |
Project |
7 |
Engineering Study and design of Construction of Alvan Ikoku College of Education Internal Road Drainage Network at New Land across the River Nworie, Owerri a) Construction of reinforced concrete crib – retaining wall, land reclaimation. b) Construction of lined drains and culverts along the road network within the new extension area of the campus, at the other side of Nworie River c) Construction of access Bridge (2 x 15m long span) across the Nworie River October 2011 – January 2012 |
8 |
Ektiti State Water and Flood Control Project: Design of Gully Erosion Control at Odo Ado and Ijero Ekiti - Concrete Channel - 3.0 x 5m; 2.4km long - Concrete Line drains (1.2 x 1.2m; 1.6km long - Pedestrian bridges; 4No. - Vehicle bridges – 1No.; 1 x 8m long - Access box culverts (3 x3 –single cell) 4Nos - Inlet storm water channel and discharge (Sept 2007 – April 2008) |
9 |
Ektiti State Water and Flood Control Project: Design of Gully Erosion Control at Igogo - Concrete Channel - 3.0 x 6.5m; 3.82km long - Concrete Line drains (1.0 x 1.5m; 2.4km long - Pedestrian bridges; 6Nos. - Access box culverts (3 x3 –single cell); 6Nos - Inlet storm water channel and discharge - Retaining wall; total length = 285m Sept 2007 – December 2007 |