Flood Control, Roads, Huighway, Jetties, Dams and Irrigation Projects
S/No |
Project |
1 |
Consultancy services for design of Nasarawa Irrigation Project consisting of (i) Laminga in Karu / Nasarawa LGA; 6,600ha, (ii) Doma in Doma LGA; 6,600ha, (iii) Garaku in Kokona / Nasarawa / Doma LGAs; 3,100ha, (iv) Ushim in Nasarawa LGA; 4,500ha. Total irrigation field; 20,800ha. |
2 |
Consultancy Services for Safety Enhancement Plan for Ero, Egbe, Ureje and Itapaji Dams Ero Dam capacity 104,500m3/day. spillway; 33m, structure 40,000m3. Egbe Dam spillway 500m,maximum dam height of 2Sm Ureje Dam earth dam 900m, capacity 10,000m3/day Itapaji Dam earth dam with concrete 400m height 24m. capacity 5, 175m3/day, spillway; 120m (November 2016 – January 2017) |
3 |
Study and design of Gravity Irrigation Scheme (Irrigation and Dam Component) at Farm Centre (II), Abeokuta. Irrigation Network; - 11.27km main canal; 6.15km tertiary canal (October 2015 – January 2015) |
4 |
Study and design of Irrigation Scheme (Irrigation and Dam Component) at Igbojaye in Oyo State Irrigation Network; - 5.82km main canal - 2.44km tertiary canal (October 2014 – December 2014) |
5 |
Consultancy services for Hydrographic Survey Of Oyan River Dam Reservoir and Design of Rehabilitation Works, Abeokuta Flood flow of storm water over the 2,129.17km2, minimum flow 22m3/s, normal flow; range of 380 to 3,800m3/s, peak (flood discharge) flow is 5,280m3/s. (October - November 2012) |
6 |
Construction Supervision of Rehabilitation of Oyo Regional Water Supply Scheme, Oyo Town in Oyo State − 22,000m3/day Raw water supply system 350mm diameter steel raw water mains, − Treatment Units 9,000m3/day capacity − 4,800m3 capacity service reservoir − Ancillary works. (February 2011 – May 2012) |
7 |
Design of Water Supply Scheme at Obafemi Awolowo University Teaching Hospital Complex, Ile Ife Dam lake: 4.25mil cu.m Treatment Plant: - 15,000cu.m/day Reservoirs: 2 x 3,000 cu., Transmission Line: 5.0km (August 2010 – September 2010) |
8 |
Consultancy Services for the executions of Project for the Provision of Potable Water through Desalination by Reverse Osmosis Process for Riverine Communities in Ondo State. July 2010 |
9 |
Detailed design and procurement of Refurbishment of the existing Low and High Lift Pump Stations at Asejire Water Supply Scheme. - Repair and installation of new LLPS 6 x 45,000cu.m - Repair and installation of new HLPS 4 x 25,000cu.m/hr, 3 x 30,000cu.m/hr (March 2010 – August 2010) |
10 |
Design for the Rehabilitation of Ede Headwork, Ede in Osun State - Replacement of low lift pumps – 4 x 25,000cu.m/hr. - High Lift Pumps; 6nos for total output of 180,000cu.m/day - Treatment Unit, chemical plant, chlorination, storage reservoir (45,000) and 2MVA Generator set (March 2010 – September 2010) |
11 |
Design for the Rehabilitation of Igboho Water work, Igboho in Osun State Dam lake: 1.2mil cu.m Treatment Plant: - 22,700cu.m/day Reservoirs: 2 x 3,000 cu., Transmission Line: 5.0km (March 2010 – September 2010) |
12 |
Consultancy services for the design and supervision of the relocation of water supply pipelines and facilities affected by Queen Cinema – Dugbe – Oke Bola – Molete road dualisation project. (9.5km BHS) (Oct 2009 – Sept 2010) |
13 |
Study and design of Irrigation Scheme (Irrigation and Dam Component) at Onipaanu in Oyo State Dam lake: 2.72mil cu.m/175 Ha Irrigation Network; - 4.38km main canal - 7.22km tertiary canal (December 2008 – April 2009) |
14 |
Study and Design of Medium Earth dam at University of Ibadan, Ibadan. Dam lake: 1.38mil cu.m/124 Ha Treatment Plant: - 13,800cu.m/day Reservoirs: 2 x 6,500 cu., Transmission Line: 5.0km Distribution Network; 15.4km (June 2008 – Nov 2008) |
15 |
Study and Design of Small/Medium Earth dam at Ikorodu. Dam lake: 9.62mil cu.m/275 Ha. (March 2008 – Sept 2008) |
16 |
Feasibility Studies for Ibadan Water Supply Project III · Expansion and extension of the existing water distribution network in Ibadan city from the present 109,600m3/day to 361,400m3/day, · Improvement of existing water distribution network & repair work on the headwork (Nov 2007 – Apr 2008) |
17 |
Consultancy services for road and transportation projects in Ondo State involving (i) Design of concrete Jetty (6.0m x 30.0m on piled foundation) and 1.0 piled-deck walkway in Obenla, Ilaje LGA; April 2022 – June 2022 (ii) Design and construction supervision of Ugbonla - Aiyetoro road (6.54km); October 2021 – February 2022 (iii) Design and construction supervision of rehabilitation of Alape Bridge to Araromi Waterside (32.7km), Ondo State; March 2021 – December 2022 (iv) Design and construction supervision of Coastal road, Araromi Seaside, Ondo State – Ode omi, Ogun State - Ibeju - Lekki - Lagos with spurs (37.5km); November 2018 – December 2023 (v) Review of design and construction supervision of Aboto-Atijere road (28.5km); December 2019 – October 2022 (vi) Design and construction supervision of Kiribo, Igbotu, Igbobini communities in Ondo State (5.4km); October 2018 – December 2020 (vii) Design and construction supervision of Flyover / Interchange Bridge at Ondo-Okitipupa Road and Sagamu - Ore - Benin Expressway Junction, Ore, Ondo State; May 2018 – June 2020 (viii) Design and construction supervision of single carriageway from Ijoka/Okeya Junction - Okeobere Elemo – Idanre Township with spur to Okeya & Igisogba Ondo State (15.0km); July 2017 – October 2021 (ix) Design and construction supervision for Dualisation of Oba Adesida road (A-Division)- Hospital (Oba-Osupa) road-Oluwatuyi road – Ijoka (Oke Iya junction) with spur to Alafia Tayo (roundabout) and Idiagba Tuntun (Investment Junction) (8.13km); July 2017 – December 2022 (x) Design and construction supervision of Sabomi - Ajagba (East-West Access) road (2.0km); April 2017 – August 2018 (xi) Design of rehabilitation of Ore Township Road Project (Section II: Sabo to Lagos/Benin expressway - 2.5km); April – November 2017, (xii) Design and construction supervision of the rehabilitation of Ore Township Road Project (Section 1: Mobil to Sabo Junction - 0.5km); April 2017 – June 2022
|
S/No |
Project |
18 |
Extention of Services of Civil Engineering Consultant for the Supervision of Construction of On-going Dualisation Road and Bridge Projects in Oyo State i. Dualisation of Idi Ape – Bashorun – Odogbo Road Project, Ibadan. ii. Dualisation of Oke Adu – Agodi Gate – Airport Road Project, Ibadan. iii. Dualisation of Saki – Ilesa – Ibariba Road Project iv. Ibadan – Ologuneru – Eruwa Road Project May 2013 – June 2014 |
19 |
Engineering Consultant for the Supervision of Construction of On-going Dualisation Road and Bridge Projects in Oyo State v. Dualisation of Idi Ape – Bashorun – Odogbo Road Project, Ibadan. vi. Dualisation of Oke Adu – Agodi Gate – Airport Road Project, Ibadan. vii. Dualisation of Saki – Ilesa – Ibariba Road Project viii. Ibadan – Ologuneru – Eruwa Road Project May 2016 – April 2017 |
20 |
Supervision of Construction of Road and Bridge Projects in Oyo State Dualisation of Ilorin Expressway Junction – Takie – Palace – Ogbomoso Grammar School Road Project, Ogbomoso. May 2013 – June 2014 |
21 |
Construction of Jetty at Port Harcourt, Rivers State involving Quay Structures, Berthing Jetty, Boats Shed, Waiting room, Utilities, Access road, Bid documents, etc. April 2013 – December 2014 |
22 |
Construction Supervision of Ibafo – Mowe – Ofada Road Project, Ogun State (55km) and 2Nos; 15 x 20m long span bridge. March 2013 – March 2014 |
23 |
Consultancy series for the Special Road Projects of Governments in the State of Osun: Osun West Senatorial District May 2012 – May 2013 |
24 |
Construction Supervision of dualisation of Sango – Ojodu Abiodun Road, Sango (60km) and 2Nos; 15 span x 20m long span bridges January 2013 – June 2014 |
25 |
Consultancy services for the construction of Access Road and Car Park to 2500 Capacity Auditorium Complex. May – Sept 2012 |
26 |
Design and Construction Supervision Rehabilitation of Ede – Logun – Araromi – Ojudo – Ode Omu Road Project – Design Stage August 2009 – November 2009 |
S/No |
Project |
27 |
Project management services on Road/Civil Engineering projects. January 2009 – December. 2009 |
28 |
Consultancy services for the construction of Oye – Are road project (12.15km). January 2009 – December 2009 |
29 |
Design of Slab Deck Bridge (3 x 9m at Ch 5+116, and 1 x 8m at Ch 10+378 & Ch 14+200 long span) Gungji – Shiwer – Dokpai with Spur to Tiplik Road (33Km). Dec 2008 – January 2009 |
30 |
Construction of River Ero Bridge at Ewu (2 x 15m long span). December 2008 – June 2009 |
31 |
Design of Bridge (2 x 12m long span) over Ogun River at Km. 22+950 along Sepeteri – Igboho Road. September – December 2008 |
32 |
Rehabilitation of Ife Township Road, Ile Ife. July 2008 – July 2009 |
33 |
Design of bridge (4 x 12m long span) at Km 1+800 along Sepeteri – Igboho Road. May 2008 – June 2008 |
34 |
Consultancy services for the Rehabilitation of Access Road within the Polytechnic, Iree. Feb 2008 – August 2008 |
35 |
Construction of Iware – Akinmorin Road Project. (12.8km, including 1 x 8.3m long single span Bridge.) February – June 2008 |
36 |
Construction of Iresa Adu – Ilajue Road Project (26.75km, including 1 x 13m long single span Bridge.) March – July 2008 |
37 |
Consultancy Services for the Design of Dualization of Molete Dugbe – Queen Cinema Road Project involving the extension of 2 x 15m double span Bridge at Dugbe Alawo, Ibadan Nov. 2007 – January 2008 |
38 |
Consultancy services for the Honeycomb Road Development Scheme Apr 2007 – August 2008 |