Construction of City of Grace Cathedral: Structural Engineering Design of the 3-Storrey of about 3 x 780m2 Floors, Parks, Surface Drainage Structures. |
|
Name/Address of Client |
The Provost, City of Grace Cathedral. |
Location of Services |
City of Grace Cathedral, opposite Elepe Community High School, Elepe, Ikorodu, Lagos State. |
Project Duration |
November 2019 – May 2022 |
Contract Amount |
N84.9 million |