Taraba State: Lot 1: Improvement of Jalingo Distribution Network; 16km – Lot 1
Taraba State: Lot 1: Improvement of Jalingo Distribution Network; 16km – Lot 1
Figure 6.1.: Setting out and preparation for excavation of pipeline trench
Figure 6.2.: Setting out and preparation for excavation of pipe trench
Figure 6.3.: EMMP Action; warning, traffic control, road diversion, public safety, etc.
Figure 6.4.: Delivery of 10-bar UpVC pipes
Figure 6.5.: Excavation of trench for pipelaying
Figure 6.6.: Excavation of trench for pipelaying
Figure 6.7.: Pipelaying work
Figure 6.8.: Pipelaying across roads involving excavation to restore road later, trans-boring process to avoid causing damages to the roads/highways
Figure 6.9.: Pipelaying work