Imo State Extension of owerri distribution network by 3.8km length of 150mm Dia. UPVC pipeline
Imo State Extension of owerri distribution network by 3.8km length of 150mm Dia. UPVC pipeline
Figure 3.1.: Detailed explanation to technical personnel on the pipeline alignment within fully built-up city area of Owerri; Muchies Junction – IMSU Campus
Figure 3.2.: Detailed explanation to technical personnel on the pipeline alignment within fully built-up city area of Owerri; Muchies Junction – IMSU Campus
Figure 3.3.: Training Seminar / Workshop on EMMP organised by all stakeholders for supervising personnel
Figure 3.4.: Training Seminar / Workshop on EMMP organised by all stakeholders for supervising personnel
Figure 3.5.: Delivery of 10-bar UpVC pipes, fittings, valves, accessories, etc. to Owerri site
Figure 3.6.: Fitting, rubber gasket/rings, accessories and project signboard
Figure 3.7.: Excavated trench for pipelaying works
Figure 3.8.: Laying of 150mm dia. 10-bar UpVC pipe in IMSU Campus, Owerri
Figure 3.9.: Discussion between the ImSWC and the RE, and measurement of pipe thickness to confirm compliance with Specification
Figure 3.10.: Revised drawing of distribution pipeline extension to IMSU Campus
Figure 3.11.: Layout of primary distribution network in IMSU Campus