Structural Design for the Construction of Jetty at Obenla, Ilaje LGA, Ondo State. Jetty structure to accommodate 6 medium size Boats, 30m long berth / deck platform on pile foundation, waiting hall, transport picking point, 1,000m long access platform / a

Structural Design for the Construction of Jetty at Obenla, Ilaje LGA, Ondo State. Jetty structure to accommodate 6 medium size Boats, 30m long berth / deck platform on pile foundation, waiting hall, transport picking point, 1,000m long access platform / a

Structural Design for the Construction of Jetty at Obenla, Ilaje LGA, Ondo State. Jetty structure to accommodate 6 medium size Boats, 30m long berth / deck platform on pile foundation, waiting hall, transport picking point, 1,000m long access platform / apron.

Name/Address of Client

Ondo State Government / Ondo State Oil Producing Areas Development Commission, Oba-ile, Akure

 

Location of Services

Obenla, Ilaje LGA, Ondo State

Project Duration

February 2022 – August 2024

Contract Amount

N2.92 billion

Date

25 July 2024

Tags

3 - Civil Structures - Jetties and Bridges

Abfort Associates as an engineering consulting firm is registered member by the Council of Registered Engineers of Nigeria (COREN). It has well-seasoned and experienced engineers, who are members of the Nigeria Society of Engineers (NSE), and registered by the Council for the Regulation of Engineering in Nigeria, in relevant disciplines.

Connect

Comfort Adebisi Multi-Purpose Complex
KM 8 Al-Hayyu Junction

+234 803 706 5878

 

 

,