Design and Construction Supervision of Road Station at Araromi Waterside, Ondo State for the proposed Dual Carriageway from Akodo, Lekki, Lagos State through Ode-omi, Ogun State to Araromi Waterside to Omotoso Ondo State (82.4km)
Facilities at Road Station
Toll-Gates with Weigh Bridges,
Petrol / Gas Station
Medical / Accident Rescue Centre
Fire Station
Police / Security Station
Car Park with Mechanic Sheds.
Trailer Park with Mechanic Sheds
Shopping Centre with Cafeteria
Guest Houses
Admin Office; PR, Utility
Dept (power supply, water supply, etc.).,
Name/Address of Client
Lagos, Ogun & Ondo States Governments
Location of Services
Akodo Lekki, Lagos – Odeomi, Ogun State – Araromi Waterside – Omotoso, Ondo State.
Project Duration
November 2021 – January 2024
Contract Amount
N6.58 billion
Status
On-going
Date
24 July 2024
Tags
2 - Building Structures Presentation and Portfolio