S/No |
Project |
|
|
Abia State |
|
1 |
Design and construction supervision of Ariaria Water Supply Scheme, Aba, Abia State involving: - Water distribution network of 5km length, 6-bar UpVC pipe of sizes 300mm, 250mm, 150mm and 100mm dia. - Rehabilitation treatment plant of 400m3/d capacity, - Environmental Social Impact Assessment (ESIA) and implementation of Environmental Social Management Plan (December 2020 – March 2022)
|
|
2 |
Design of Ubakala Water Supply Scheme, Umuahia, Abia State involving: - Water distribution network project of 5km length, 6-bar UpVC pipe of sizes 300mm, 250mm, 150mm and 100mm dia. - Rehabilitation treatment plant project of 400m3/d capacity, - Environmental Social Impact Assessment (ESIA) (December 2020 – March 2021)
|
|
3 |
Design of CKC Water Supply Scheme, Aba, Abia State involving: - Water distribution network of 10km length, 6-bar UpVC pipe of sizes 300mm, 250mm, 150mm and 100mm dia. - Rehabilitation treatment plant of 800m3/d capacity, - Environmental Social Impact Assessment (ESIA) (December 2020 – March 2021)
|
|
|
Delta State |
|
4 |
Design and construction supervision of Iseluku water supply schemes, Iselle-Ukwu, Delta State involving:
- Water distribution network of 8km length of 110mm dia, 6km of 160mm dia and 4km of 200mm dia UpVC pipe network, - Rehabilitation of treatment plant of 740m3/day capacity, - Rehabilitation of 150m3 EWT, - Rehabilitation of 750Kva power transformer substation on dedicated 11KVA national grid - Environmental Social Impact Assessment (ESIA) and implementation of Environmental Social Management Plan
(July 2021 – December 2021)
|
|
5 |
Design of Ogwashi-Uku water supply schemes, Ogwashu-Uku, Delta State involving: - rehabilitation of treatment plant of 450m3/day capacity, - laying of 8km length of 110mm, 6km of 160mm and 4km of 200mm dia. UpVC pipe network, - District Metering Areas (DMA) including Bulk meters for DMAs, - Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances - installation of water supply network including pipelines, valves, and pressure gauges, transmission system from sources to reservoirs, - rehabilitation of 11kVA power transformer substation on dedicated 11KVA national grid - Environmental Social Impact Assessment (ESIA) (December 2020 – March 2021) |
|
6 |
Design of Okpanam water supply scheme, Okpanam, Asaba, Delta State involving: - Water distribution network project of 8km length of sizes, Ø110mm and Ø160mm UpVC pipe network, - New treatment plant of 350m3/day capacity, - Okpanam District Metering Area (DMA) and Bulk meters in the DMA, - Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances - Water supply network system including pipelines, valves, and pressure gauges, transmission system from sources to reservoirs, - Power supply system of 450kVA/11kV power transformer substation on dedicated national grid mains - Environmental Social Impact Assessment (ESIA)
(December 2020 – March 2021)
|
|
7 |
Design for the refurbishment of water supply system and treatment chambers project at Ozoro, Obiaruku, Koko, Sapele, Umunede in Delta State involving: - Water supply / distribution network project of 2km length in 75mm dia UpVC pipe, - Rehabilitation of the treatment chambers, - Stand-pipe with 4-fetch-plinth and 200m long wastewater drains - Environmental Social Impact Assessment (ESIA)
(December 2020 – March 2021)
|
|
|
Imo State |
|
8 |
Design and construction supervision of distribution network project of 3.85km long, 300mm dia. UpVC pipe from Munchie Junction to IMSU Campus in Owerri City involving:
- Water distribution network of 2.65km length of 110mm and 160mm dia UpVC pipelines including appurtenances, - Water supply transmission mains of 1.2km length 200mm dia UpVC pipeline, - Rehabilitation of pipe connections with 50m3 EWT, - Environmental Social Impact Assessment (ESIA) and implementation of Environmental Social Management Plan
((December 2020 – March 2022))
|
|
9 |
Design of Egbeada water supply and distribution network project, Egbeada, Owerri, Imo State involving: - Water supply main in coated steel pipes of 100m long, 300mm (100m in length), diameter 250mm (500m in length) and diameter 200mm (200m in length),
- Disconnection from existing to the new transmission mains from Egbeada booster station Pump tto the Elevated Water Tank.
- Environmental Social Impact Assessment (ESIA)
(December 2020 – March 2021) |
|
10 |
Design of water supply and distribution network project in high pressure of 16 bars, PE pipe of 6km length of pipeline for maintenance and the replacement of the damaged and Asbestos pipes in Owerri City, Imo State
|
|
11 |
Design of Aladinma Estate Model District Metered Area (DMA) project, Aladinma, Owerri, Imo State involving: - Water supply and distribution network systems including pipelines, valves, and pressure gauges, transmission system from reservoirs to DMA, - District Metering Areas (DMA) including Bulk meters for DMAs, - Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances - Environmental Social Impact Assessment (ESIA)
(December 2020 – March 2021)
|
|
|
Niger State |
|
12 |
Design and construction supervision of 2.2km length Transmission Mains improvement project in Minna, Niger State involving: - Disconnection of 2200 consumers’ connection on the transmission / rising main, - Distribution pipeline of 2.2km alongside the rising main for the reconnection of 2200 consumers, - Installation of post-treatment improvement units consisting of Alum, Lime and HTH (chlorination) - Environmental Social Impact Assessment (ESIA) and implementation of Environmental Social Management Plan (December 2020 – March 2022) |
|
13 |
Design and construction supervision of Minna Pilot District Metered Area (DMA) project, Minna, Niger State involving:
- Distribution network of 16km length of 110mm, 6km of 160mm and 4km of 200mm dia. UpVC pipe network, - District Metering Areas (DMA) including Bulk meters for DMAs, - Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances - installation of water supply network including pipelines, valves, and pressure gauges, transmission system from sources to reservoirs,
- Environmental Social Management Plan (ESMP)
(July 2021 – December 2021) |
|
14 |
Design of Service Reservoirs project of 500m3 and 100m3 capacity of 16m high Steel / GRP structure at Pogo Village and Paiko Junction respectively to provide access to the 2 major communities along the Pumping Main on Minna - Suleja Road involving:
- Site survey map of reservoir site, - General layout design/drawing, - Hydraulic analysis layout including geotechnical details, - Design details and drawings for foundation, pipelines, piping connections, drainage structures, - Structural details and drawings for stanchions, base and top plates, sidewalls, access ladders, ventilators, lightening arrestors, etc., - Detailed drawing for pumps, pump-house, power supply and connections, - Miscellaneous and ancillaries; perimeter fence with entrance gates, potable water supply, chambers, ducts, perimeter lighting, - Environmental Social Impact Assessment (ESIA)
(December 2020 – March 2021)
|
|
15 |
Design of 2.2km length Transmission Mains improvement project in Minna, Niger State involving: - Disconnection of 2200 consumers’ connection on the transmission / rising main, - Distribution pipeline of 2.2km alongside the rising main for the reconnection of 2200 consumers, - Installation of post-treatment improvement units consisting of Alum, Lime and HTH (chlorination) - Environmental Social Impact Assessment (ESIA) (December 2020 – March 2021)
|
|
16 |
Design of Minna Pilot District Metered Area (DMA) project, Minna, Niger State involving:
- Distribution network of 16km length of 110mm, 6km of 160mm and 4km of 200mm dia. UpVC pipe network, - Installation of bulk meters for DMAs, - District Metering Areas (DMA) including Bulk meters for DMAs, - Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances - installation of water supply network including pipelines, valves, and pressure gauges, transmission system from sources to reservoirs, - Environmental Social Impact Assessment (ESIA)
(December 2020 – March 2021)
|
|
|
Taraba State |
|
17 |
Design and construction supervision of water distribution network project of 16km length in Central Supply area of Jalingo, Taraba State involving:
- Water distribution network of 16km length of sizes 300mm, 200mm, 160mm, and 110mm dia. Pipelines including appurtenances, - Rehabilitation of pipe connections with existing 3500m3 EWT, - Environmental Social Impact Assessment (ESIA) and implementation of Environmental Social Management Plan
(December 2020 – March 2022)
|
|
18 |
Design of water distribution network project of 55km total length for Five towns (Jalingo, Wukari, Gembu, Zing and Jen) in Taraba State involving: - Distribution network of 75mm, 110mm and 160mm dia UpVC pipe network, - Supply / transmission mains from reservoir to network areas including necessary control valves, - Pipeline protection, FH, drainage, indicator posts, etc - Environmental Social Impact Assessment (ESIA).
(December 2020 – March 2021)
|
|
19 |
Design of 3,500m3 storage reservoir capacity project of 16m high Steel / GRP structure in Jalingo, Taraba State involving:
- Site survey map of reservoir site, - General layout design/drawing, - Hydraulic analysis layout including geotechnical details, - Design details and drawings for foundation, pipelines, piping connections, drainage structures, - Structural details and drawings for stanchions, base and top plates, sidewalls, access ladders, ventilators, lightening arrestors, etc., - Detailed drawing for pumps, pump-house, power supply and connections, - Miscellaneous and ancillaries; perimeter fence with entrance gates, potable water supply, chambers, ducts, perimeter lighting, - Environmental Social Impact Assessment (ESIA)
(December 2020 – March 2021)
|
|
20 |
Design of Jalingo Pilot District Metered Area (DMA) project, Jalingo, Taraba State involving:
- Distribution network of 16km length of 110mm, 6km of 160mm and 4km of 200mm dia. UpVC pipe network, - District Metering Areas (DMA) including Bulk meters for DMAs, - Consumers’ electronic water-meter connection, electronic water-meter Vending station, and appurtenances - installation of water supply network including pipelines, valves, and pressure gauges, transmission system from sources to reservoirs, - Environmental Social Impact Assessment (ESIA)
(December 2020 – March 2021)
|
|
21 |
Design of Water Supply Scheme for Federal University of Technology, Akure, Nigeria involving:
- Raw water intake: 4.25mil cu.m - Treatment Plant: - 3,200cu.m/day - Reservoirs: 1,500 cu.m, - Transmission Main and distribution Network: 5.0km - Environmental Social Impact Assessment (ESIA) (December 2019 – March 2020)
|
|
22 |
Consultancy Services for the supervision of Rehabilitation and Expansion of Igbesa Water Supply Scheme involving storage reservoirs, transmission pipelines and distribution network, Igbesa, Ogun State.
(June 2021 – June 2021)
|
|
23 |
Design and Supervision of Construction works of the Upgrading and Expansion of Water Distribution Network in selected towns in Damboa Local Government Area, Damboa, Borno State
(April 2018 – May 2020)
|
|
24 |
Consultancy Services for Safety Enhancement Plan project for Ero, Egbe, Ureje and Itapaji Dams; • Ero Dam capacity 104,500m3/day. Spillway; 33m, structure 40,000m3. Egbe Dam spillway 500m, maximum dam height of 25m • Ureje Dam earth dam 900m, capacity 10,000m3/day • Itapaji Dam earth dam with concrete 400m height 24m. capacity 5, 175m3/day, spillway; 120m (November 2016 – January 2017)
|
|
25 |
Consultancy Services for the Design Review and Construction Supervision of Water Distribution Network to Areas under Arakanga Water Supply Scheme, Iberekodo, Abeokuta, Ogun State
(February 2019 – March 2020)
|
|
26 |
Construction Supervision of Rehabilitation of Oyo Regional Water Supply Scheme, Oyo Town in Oyo State − 22,000m3/day Raw water supply system 350mm diameter steel raw water mains, − Treatment Units 9,000m3/day capacity − 4,800m3 capacity service reservoir − Ancillary works.
(February 2011 – Dec 2019)
|
|
27 |
Detailed study and design of private water supply services for six (6) towns (Iganna, Shaki, Ogbomosho, Ootu, Igangan and Oyo) in Oyo State based on total population (2.353mil), land area (59,015ha), average per capita-demand (200lcd), estimate of viable customers (pprox.. 300,000pers) among other factors.
(Jan 2016)
|
|
28 |
Detailed hydraulic analysis and design of Water Distribution and Wastewater Networks project for Ilubirin, Victoria Island, Lagos covering 64.8ha and involving water supply network (2.4km length of 100 – 150mm diameter pipes, 25 nodes, pressure range of 3.4 to 4.5 bars) wastewater network (5.9km length of 100 – 150mm diameter pipes, 45 nodes)
(June – September 2016)
|
|
29 |
Consultancy Services for the executions of Project, for the Provision of Potable Water through Desalination by Reverse Osmosis Process for Riverine Communities in Ondo State.
July 2010 – October 2015
|
|
30 |
Study and design of Gravity Irrigation Scheme (Irrigation and Dam Component) at Farm Centre (II), Abeokuta. Irrigation Network; - 11.27km main canal; 6.15km tertiary canal.
(October 2015 – January 2015)
|
|
31 |
Design and schedule of materials for the Water Distribution Network project in VGC Estate, Lagos covering 2.6km2, 34.9km length of 100 - 150mm diameter pipes, 1050 nodes, pressure range of 3.4 to 4.5 bars with booster pumps for multi-storey buildings (June – September 2014).
|
|
32 |
Design of Water Distribution Network project covering Melrose Estate; 5,061m length of HdPE 100, 75 and 110 mm diameter sizes, 612 Nodes, 2.5 – 4.0 bars, and Ikeja Estate; 340m length of PE 100, 75 and 110 mm diameter sizes, 24 Nodes, 3.0 – 4.5 bars
(June – September 2014).
|
|
33 |
Design and construction supervision of Flood and Erosion control facilities for the Four (4) Priority Sites within Ibadan metropolitan in Oyo State. Locations; · Saasa- Osajin Apete Road, 2 x 3m Double-cell Box Culvert · Ola Adua- Old Akufo Road, 2 x 3m Triple-cell Box Culvert · Cele Rainbow- Ojo Ekun, 2 x 3m Triple-cell Box Culvert and · Ogbere Pegba- Egbeda Tuba Road 2 x 15m span Bridge
(January 2014 – April 2016)
|
|
34 |
Detailed engineering design of Flood and Erosion control of Two (2) Priority Sites within Ibadan metropolitan in Oyo State. (Design Stage) involving:
· 15m Single Span Bridge at Abonde Area and · 20m Single Span Bridge at Abatakan Area and Associated Structures
July 2016 – October 2016. |
|
35 |
Design of Water Supply Scheme at Obafemi Awolowo University Teaching Hospital Complex, Ile Ife consisting of (i) Dam lake: 4.25mil m3, (ii) Treatment Plant: - 1,500m3/day, (iii) Reservoirs: 2 x 3,000m3, and (iv) Transmission Line: 5.0km (August 2010 – September 2013) |
|
36 |
Consultancy services for design of Nasarawa Irrigation Project consisting of (i) Laminga in Karu / Nasarawa LGA; 6,600ha, (ii) Doma in Doma LGA; 6,600ha, (iii) Garaku in Kokona / Nasarawa / Doma LGAs; 3,100ha,
(iv) Ushim in Nasarawa LGA; 4,500ha. Total irrigation field; 20,800ha. November 2017 – February 2019 |
|
37 |
Consultancy services for Hydrographic Survey project Of Oyan River Dam Reservoir and Design of Rehabilitation Works, Abeokuta Flood flow of storm water over the 2,129.17km2, minimum flow 22m3/s, normal flow; range of 380 to 3,800m3/s, peak (flood discharge) flow is 5,280m3/s. (October 2012 – November 2013) |