Flood Control, Roads, Huighway, Jetties, Dams and Irrigation Projects

Print

Flood Control, Roads, Huighway, Jetties, Dams and Irrigation Projects

S/No

Project

1         

Consultancy services for design of Nasarawa Irrigation Project consisting of

(i)               Laminga in Karu / Nasarawa LGA; 6,600ha,

(ii)              Doma in Doma LGA; 6,600ha,

(iii)            Garaku in Kokona / Nasarawa / Doma LGAs; 3,100ha,

(iv)            Ushim in Nasarawa LGA; 4,500ha. Total irrigation field; 20,800ha.

2         

Consultancy Services for Safety Enhancement Plan for Ero, Egbe, Ureje and Itapaji Dams

Ero Dam capacity 104,500m3/day. spillway; 33m, structure 40,000m3.

Egbe Dam spillway 500m,maximum dam height of 2Sm

Ureje Dam earth dam 900m, capacity 10,000m3/day

Itapaji Dam earth dam with concrete 400m height 24m. capacity 5, 175m3/day, spillway; 120m

(November 2016 – January 2017)

3         

Study and design of Gravity Irrigation Scheme (Irrigation and Dam Component) at Farm Centre (II), Abeokuta. Irrigation Network; - 11.27km main canal; 6.15km tertiary canal

(October 2015 – January 2015)

4         

Study and design of Irrigation Scheme (Irrigation and Dam Component) at Igbojaye in Oyo State

Irrigation Network; - 5.82km main canal

-                  2.44km tertiary canal

(October 2014 – December 2014)

5         

Consultancy services for Hydrographic Survey Of Oyan River Dam Reservoir and Design of Rehabilitation Works, Abeokuta

Flood flow of storm water over the 2,129.17km2, minimum flow 22m3/s, normal flow; range of 380 to 3,800m3/s, peak (flood discharge) flow is 5,280m3/s.

(October - November 2012)

6         

Construction Supervision of Rehabilitation of Oyo Regional Water Supply Scheme, Oyo Town in Oyo State

−     22,000m3/day Raw water supply system 350mm diameter steel raw water mains,

−     Treatment Units 9,000m3/day capacity

−     4,800m3 capacity service reservoir

−     Ancillary works.

(February 2011 – May 2012)

 

 

7         

Design of Water Supply Scheme at Obafemi Awolowo University Teaching Hospital Complex, Ile Ife

Dam lake: 4.25mil cu.m

Treatment Plant: - 15,000cu.m/day

Reservoirs: 2 x 3,000 cu.,

Transmission Line: 5.0km

(August 2010 – September 2010)

8         

Consultancy Services for the executions of Project for the Provision of Potable Water through Desalination by Reverse Osmosis Process for Riverine Communities in Ondo State.

July 2010

9         

Detailed design and procurement of Refurbishment of the existing Low and High Lift Pump Stations at Asejire Water Supply Scheme.

-      Repair and installation of new LLPS 6 x 45,000cu.m

-      Repair and installation of new HLPS 4 x 25,000cu.m/hr, 3 x 30,000cu.m/hr

(March 2010 – August 2010)

10      

Design for the Rehabilitation of Ede Headwork, Ede in Osun State

-       Replacement of low lift pumps – 4 x 25,000cu.m/hr.

-       High Lift Pumps; 6nos for total output of 180,000cu.m/day

-       Treatment Unit, chemical plant, chlorination, storage reservoir (45,000) and 2MVA Generator set

(March 2010 – September 2010)

11      

Design for the Rehabilitation of Igboho Water work, Igboho in Osun State

Dam lake: 1.2mil cu.m

Treatment Plant: - 22,700cu.m/day

Reservoirs: 2 x 3,000 cu.,

Transmission Line: 5.0km

(March 2010 – September 2010)

12      

Consultancy services for the design and supervision of the relocation of water supply pipelines and facilities affected by Queen Cinema – Dugbe – Oke Bola – Molete road dualisation project. (9.5km BHS)

(Oct 2009 – Sept 2010)

13      

Study and design of Irrigation Scheme (Irrigation and Dam Component) at Onipaanu in Oyo State

Dam lake: 2.72mil cu.m/175 Ha

Irrigation Network; - 4.38km main canal

-             7.22km tertiary canal

(December 2008 – April 2009)

14      

Study and Design of Medium Earth dam at University of Ibadan, Ibadan.

Dam lake: 1.38mil cu.m/124 Ha

Treatment Plant: - 13,800cu.m/day

Reservoirs: 2 x 6,500 cu.,

Transmission Line: 5.0km

Distribution Network; 15.4km

(June 2008 – Nov 2008)

 

 

15      

Study and Design of Small/Medium Earth dam at Ikorodu.

Dam lake: 9.62mil cu.m/275 Ha.

(March 2008 – Sept 2008)

16

Feasibility Studies for Ibadan Water Supply Project III

·     Expansion and extension of the existing water distribution network in Ibadan city from the present 109,600m3/day to 361,400m3/day,

·     Improvement of existing water distribution network & repair work on the headwork

(Nov 2007 – Apr 2008)

17

Consultancy services for road and transportation projects in Ondo State involving

(i)           Design of concrete Jetty (6.0m x 30.0m on piled foundation) and 1.0 piled-deck walkway in Obenla, Ilaje LGA; April 2022 – June 2022

(ii)          Design and construction supervision of Ugbonla - Aiyetoro road (6.54km); October 2021 – February 2022

(iii)        Design and construction supervision of rehabilitation of Alape Bridge to Araromi Waterside (32.7km), Ondo State; March 2021 – December 2022

(iv)        Design and construction supervision of Coastal road, Araromi Seaside, Ondo State – Ode omi, Ogun State - Ibeju - Lekki - Lagos with spurs (37.5km); November 2018 – December 2023

(v)          Review of design and construction supervision of Aboto-Atijere road (28.5km); December 2019 – October 2022

(vi)        Design and construction supervision of Kiribo, Igbotu, Igbobini communities in Ondo State (5.4km); October 2018 – December 2020

(vii)       Design and construction supervision of Flyover / Interchange Bridge at Ondo-Okitipupa Road and Sagamu - Ore - Benin Expressway Junction, Ore, Ondo State; May 2018 – June 2020

(viii)      Design and construction supervision of single carriageway from Ijoka/Okeya Junction - Okeobere Elemo – Idanre Township with spur to Okeya & Igisogba   Ondo State (15.0km); July 2017 – October 2021

(ix)         Design and construction supervision for Dualisation of Oba Adesida road (A-Division)- Hospital (Oba-Osupa) road-Oluwatuyi road – Ijoka (Oke Iya junction) with spur to Alafia Tayo (roundabout) and Idiagba Tuntun (Investment Junction) (8.13km); July 2017 – December 2022

(x)          Design and construction supervision of Sabomi - Ajagba (East-West Access) road (2.0km); April 2017 – August 2018

(xi)         Design of rehabilitation of Ore Township Road Project (Section II: Sabo to Lagos/Benin expressway - 2.5km); April – November 2017,

(xii)       Design and construction supervision of the rehabilitation of Ore Township Road Project (Section 1: Mobil to Sabo Junction - 0.5km); April 2017 – June 2022

 

 

 

S/No

Project

18

Extention of Services of Civil Engineering Consultant for the Supervision of Construction of On-going Dualisation Road and Bridge Projects in Oyo State

i.     Dualisation of Idi Ape – Bashorun – Odogbo Road Project, Ibadan.

ii.    Dualisation of Oke Adu – Agodi Gate – Airport Road Project, Ibadan.

iii.   Dualisation of Saki – Ilesa – Ibariba Road Project

iv.   Ibadan – Ologuneru – Eruwa Road Project

May 2013 – June 2014

19

Engineering Consultant for the Supervision of Construction of On-going Dualisation Road and Bridge Projects in Oyo State

v.    Dualisation of Idi Ape – Bashorun – Odogbo Road Project, Ibadan.

vi.   Dualisation of Oke Adu – Agodi Gate – Airport Road Project, Ibadan.

vii. Dualisation of Saki – Ilesa – Ibariba Road Project

viii.          Ibadan – Ologuneru – Eruwa Road Project

May 2016 – April 2017

20

Supervision of Construction of Road and Bridge Projects in Oyo State

Dualisation of Ilorin Expressway Junction – Takie – Palace – Ogbomoso Grammar School Road Project, Ogbomoso.

May 2013 – June 2014

21

Construction of Jetty at Port Harcourt, Rivers State involving Quay Structures, Berthing Jetty, Boats Shed, Waiting room, Utilities, Access road, Bid documents, etc.

April 2013 – December 2014

22

Construction Supervision of Ibafo – Mowe – Ofada Road Project, Ogun State (55km) and 2Nos; 15 x 20m long span bridge.

March 2013 – March 2014

23

Consultancy series for the Special Road Projects of Governments in the State of Osun: Osun West Senatorial District

May 2012 – May 2013

24

Construction Supervision of dualisation of Sango – Ojodu Abiodun Road, Sango (60km) and 2Nos; 15 span x 20m long span bridges

January 2013 – June 2014

25      

Consultancy services for the construction of Access Road and Car Park to 2500 Capacity Auditorium Complex.

May – Sept 2012

26      

Design and Construction Supervision Rehabilitation of Ede – Logun – Araromi – Ojudo – Ode Omu Road Project – Design Stage

August 2009 – November 2009

 

 

S/No

Project

27      

Project management services on Road/Civil Engineering projects.

January 2009 – December. 2009

28      

Consultancy services for the construction of Oye – Are road project (12.15km).

January 2009 – December 2009

29      

Design of Slab Deck Bridge (3 x 9m at Ch 5+116, and 1 x 8m at Ch 10+378 & Ch 14+200 long span) Gungji – Shiwer – Dokpai with Spur to Tiplik Road (33Km).

Dec 2008 – January 2009

30      

Construction of River Ero Bridge at Ewu (2 x 15m long span).

December 2008 – June 2009

31      

Design of Bridge (2 x 12m long span) over Ogun River at Km. 22+950 along Sepeteri – Igboho Road.

September – December 2008

32      

Rehabilitation of Ife Township Road, Ile Ife.

July 2008 – July 2009

33      

Design of bridge (4 x 12m long span) at Km 1+800 along Sepeteri – Igboho Road.

May 2008 – June 2008

34      

Consultancy services for the Rehabilitation of Access Road within the Polytechnic, Iree.

Feb 2008 – August 2008

35      

Construction of Iware – Akinmorin Road Project. (12.8km, including 1 x 8.3m long single span Bridge.)

February – June 2008

36      

Construction of Iresa Adu – Ilajue Road Project (26.75km, including 1 x 13m long single span Bridge.)

March – July 2008

37      

Consultancy Services for the Design of Dualization of Molete Dugbe – Queen Cinema Road Project involving the extension of 2 x 15m double span Bridge at Dugbe Alawo, Ibadan

Nov. 2007 – January 2008

38      

Consultancy services for the Honeycomb Road Development Scheme

Apr 2007 – August 2008